Bathroom floor removed from a single-wide before a walk-in shower goes in
Example project
- Home
- 1970s single-wide manufactured home in Westminster with one bathroom and a tub
- Original request
- Replace the tub with a walk-in shower and lay a new floor
- Testing
- A Cal/OSHA-certified asbestos consultant samples the sheet vinyl, the glue and the wall panel seams in the bathroom
- Found
- Asbestos in the sheet vinyl and its glue
- Clear
- The wall panel seams
- Area
- About 40 sq ft of bathroom floor
- Timeline
- Less than 100 square feet in a renovation, so no district notice, then one working day
- Cost
- $2,000
Scope of work
The bathroom and the entry door sealed with plastic and a filter running, the vinyl lifted and the glue removed wet, bagged disposal and a cleanup. The survey, the tub removal, the shower and the new floor are separate.
Project overview
In this example, the owner of a 1970s single-wide in Westminster wants a walk-in shower where the tub sits. The rule has no carve-out for manufactured homes, so the survey comes first, as in any other house.
The floor vinyl and its glue test positive. The job removes less than 100 square feet, so no district notice is needed, and the abatement crew finishes in one day before the plumber starts.
The goal
The goal is a bare bathroom floor, so the shower pan is set over a surface with nothing positive on it.
Process
- First visit A Cal/OSHA-certified asbestos consultant samples the vinyl, the glue and the wall seams.
- Results The lab marks the vinyl and the glue positive and the wall seams clear.
- Work day The bathroom is sealed and the floor layers are removed wet.
- Then The plumber removes the tub and sets the shower pan.
Planning right
- Plan a place to wash up on the work day.
- Take towels and cabinet contents out of the bathroom.
- Tell the plumber which layers tested positive.
- Ask the park office about work hours.
Get a free quoteMore about mobile and manufactured home asbestos removal