Renovation and Demolition Abatement in Westminster, California

Typical cost in Westminster

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

Remodels that open walls and teardowns both come under South Coast Air Quality Management District Rule 1403. The survey comes prior to any demolition or renovation, and the district has to be notified of the intent to conduct any demolition.

We take care of the survey, the district notice and the removal, so the building crew starts with the asbestos work behind it.

Request a free quote
Empty room with clear plastic sheeting over the walls and windows, a light wood floor and a gray portable unit with a ribbed hose on the floor.

Jobs we abate before building starts

Remodels

Whatever a remodel opens is surveyed first, from every layer of flooring down to the joist up through the material in wall and ceiling cavities.

Taking out a bearing wall

Taking a bearing wall out is demolition, even when everything else stays put, because the rule counts removing any structural member that supports load.

Whole-house teardowns

For a teardown, the district has to hear about it whether or not asbestos turns up, and the survey result shapes the abatement plan.

Heating and cooling changes

Changing a heating or cooling system is renovation under the rule, which lists installation or removal of HVAC systems, so the survey comes before that work as well.

Notice, permits and waste

The district notice

The district asks to receive the notice no later than 10 working days before any demolition or renovation activities it covers. Plan on at least 10 working days, and expect a notice without its fee to be treated as not received. We file ours online.

At the building department

At the building department, a demolition permit applicant hands over a copy of the district notice, a requirement the district attributes to state law. Ask the department what else applies to your address.

Who may do the work

On a job this size, ask each bidder for the C-22 Asbestos Abatement classification (or proof that a qualifier passed the asbestos exam) and for the employer’s Cal/OSHA registration, since 100 square feet or more of surface area of asbestos containing materials triggers both.

Waste

California classes friable asbestos waste as hazardous. A licensed hauler takes the load away, and the manifest records what left the site.

Room with plastic sheeting over a hardwood floor and along the walls, and a section of plaster wall broken open between two windows.

Smaller wall jobs have their own page, and the home page lists the rest.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 227-1485

Call (657) 227-1485