Vinyl floor tile
Only the lab can say which side of one percent your tile is on, and the rule’s resilient floor covering definition turns on that number for asphalt and vinyl floor tile.
Typical cost in Westminster
Nothing on the floor is lifted until a lab has weighed in, in a house or a mobile home. Rule 1403 includes asphalt tile, vinyl tile and sheet vinyl in resilient floor covering once the product holds more than one percent asbestos.
The survey comes first, and the removal is planned around the lab result. We seal off the area, lift the flooring and the adhesive under it where needed, and bag the waste for disposal. New flooring is a separate job.

Only the lab can say which side of one percent your tile is on, and the rule’s resilient floor covering definition turns on that number for asphalt and vinyl floor tile.
The same definition names sheet vinyl floor covering. Before any of it is cut or pulled up, it is sampled the way tile is.
The black glue under tile is sampled too, and where the result calls for it, it comes up with the flooring.
Flooring laid over flooring gets sampled through every layer down to the joist, not just the top one.
Wet removal under the rule is Procedure 3, and it is allowed only for nonfriable material. That is why we want the lab report in hand before picking a method.
California’s waste table gives asbestos a 1 percent limit, but for asbestos that limit counts only when the material is friable, powdered or finely divided. Waste in that condition is hazardous waste and goes out with a licensed hauler and a manifest. Floor material that is not friable is not caught by the table, though other agencies may still restrict it.

Ceilings have their own page, and the home page lists everything else.